Project overview

A 15,600 m² hillside campus of four academic blocks, an auditorium and sports hall linked by covered walkways and terraced gardens.

Built on a sloped 4.2-hectare site, the campus is organised as a series of terraces that follow the natural contour. Four academic blocks in exposed concrete and timber-clad façades are connected by covered walkways, with a 600-seat auditorium and a multi-purpose sports hall anchoring the lower terrace.

The project involves extensive earthworks, soil-nail retaining walls and rainwater harvesting for irrigation. AND Construction is delivering structure, architecture and MEP under a construction management arrangement with phased handover to allow the school to open Block A first.

Project timeline

From planning to handover

  1. Phase 01 · Completed

    Planning

    Oct 2025 — Dec 2025

    Design development, permits and budget.

  2. Phase 02 · Completed

    Tender

    Dec 2025 — Jan 2026

    Estimate, BOQ and contract award.

  3. Phase 03 · Completed

    Mobilization

    Feb 2026 — Mar 2026

    Site setup, team and temporary works.

  4. Phase 04 · In progress

    Construction

    Mar 2026 — May 2027

    Structure, architecture and MEP.

  5. Phase 05 · Upcoming

    Handover

    May 2027 — Jun 2027

    Testing, commissioning and defect-free handover.

Project information

The details

Client
Yayasan Pendidikan Cendekia
Main contractor
PT AND Konstruksi Nusantara
Consultant
PT Cipta Manajemen Proyek
Architect
Rumah Studio Arsitektur
Engineer
PT Geoteknik Andalan
Location
Jl. Dago Giri, Lembang
Area
15.600 m²
Contract value
Rp 96 M
Start date
9 Feb 2026
Target completion
30 Jun 2027
Actual completion
Status
Construction