Hospitality · Completed
Bahtera Seaside Resort
Location
Jimbaran Bay
Client
PT Bahtera Hospitality
Year
2022
Contract value
Rp 214 M
Area
31.500 m²
Duration
29 bulan
Project overview
A 148-key cliff-side resort with 32 pool villas, a 60 m infinity pool and a beach club, completed two months ahead of schedule.
Terraced into a limestone cliff above Jimbaran Bay, the resort comprises a main hotel block, 32 private pool villas, a spa pavilion, a beach club and back-of-house facilities. The structural strategy combined reinforced-concrete frames with locally sourced stone cladding and ironwood screens.
AND Construction delivered the full scope including marine access works and a desalination plant. The resort was handed over in August 2024, two months ahead of the contractual completion date, with zero lost-time incidents across 1.9 million man-hours.
Project timeline
From planning to handover
Phase 01 · Completed
Planning
Nov 2021 — Mar 2022
Design development, permits and budget.
Phase 02 · Completed
Tender
Feb 2022 — May 2022
Estimate, BOQ and contract award.
Phase 03 · Completed
Mobilization
Jun 2022 — Aug 2022
Site setup, team and temporary works.
Phase 04 · Completed
Construction
Jul 2022 — Sep 2024
Structure, architecture and MEP.
Phase 05 · Completed
Handover
Aug 2024 — Oct 2024
Testing, commissioning and defect-free handover.
Phase 01 · Completed
Planning
Nov 2021 — Mar 2022
Design development, permits and budget.
Phase 02 · Completed
Tender
Feb 2022 — May 2022
Estimate, BOQ and contract award.
Phase 03 · Completed
Mobilization
Jun 2022 — Aug 2022
Site setup, team and temporary works.
Phase 04 · Completed
Construction
Jul 2022 — Sep 2024
Structure, architecture and MEP.
Phase 05 · Completed
Handover
Aug 2024 — Oct 2024
Testing, commissioning and defect-free handover.